# Table of Contents - [How do we want to schedule talks?](#schedule) - [Legend](#legend) - [Option A: General and development tracks - 15/25 buffers, 60 min lunch, dev starts at 10](#gen-and-dev) - [Option B: Two afternoon tracks (dev starts at 13:30), 10/20 buffer, 60 min lunch](#two-afternoons) - [Option C: One afternoon track, 5/10 minute buffers, 60 minute lunch](#one-afternoon) - [Option D: Remove buffer from non-live talks](#no-irc) - [Option E: Reduce buffer to non-round numbers (3/7 minutes, like 2021); 10min break 30min lunch](#non-round) - [Option F: Pack everything in one long day](#long) # How do we want to schedule talks? ## Legend - Green: no availability constraints - Red: invalid because of availability constraint - Dashed: IRC/pad Q&A, not live ## Option A: General and development tracks - 15/25 buffers, 60 min lunch, dev starts at 10 - Lots of space for Q&A and hallway conversations - People can probably find lots of sessions that interest them throughout the day - Need host/streamer(s) for dev track - ![img](schedule-option-gen-and-dev.svg) ## Option B: Two afternoon tracks (dev starts at 13:30), 10/20 buffer, 60 min lunch - Some room to breathe, some dev talks still on the main track - LUNCH: Ends at 13:45 after 13:30 - ![img](schedule-option-two-afternoon-tracks.svg) ## Option C: One afternoon track, 5/10 minute buffers, 60 minute lunch - Lightens up the schedule a little bit, allows us to test out tracks without committing too much - Needs a host/streamer for the other track - ![img](schedule-option-one-afternoon-track.svg) ## Option D: Remove buffer from non-live talks - Considerations: - Frees up about 20 minutes on each day, so we might be able to squeeze in two more talks sideways. - Pretty frenetic - ![img](schedule-option-only-live-qa.svg) ## Option E: Reduce buffer to non-round numbers (3/7 minutes, like 2021); 10min break 30min lunch - Schedule looks too precise, sets expectations; timekeeping is more challenging - Pretty frenetic - Could probably use shifts for hosts or streamers - ![img](schedule-option-non-round-buffer.svg) ## Option F: Pack everything in one long day - Considerations: - Difficult to accommodate extra talks - Host/streamer have a very long intense day - Ideas: - Split up hosting duties into shifts (volunteers can read the questions) - Use prerecorded intros and outros - Split up streaming duties into shifts (volunteers can adjust audio volume, switch to the right BBB room) - Set up cloud streaming so that streamers can work in shifts - ![img](schedule-option-one-full-day.svg)