Commit message (Collapse) | Author | Files | Lines | ||
---|---|---|---|---|---|
2023-12-02 | update schedule, repl needs 60 minutes; affects doc and windows | Sacha Chua | 1 | -1/+1 | |
2023-12-01 | allocate 35 minutes to GC | Sacha Chua | 1 | -1/+1 | |
2023-12-01 | update watch pages | Sacha Chua | 1 | -2/+6 | |
2023-11-30 | eval talk will have Q&A after the conference | Sacha Chua | 1 | -1/+1 | |
2023-11-29 | allocate more time to lspocaml | Sacha Chua | 1 | -1/+1 | |
2023-11-27 | Prepare for conference | Sacha Chua | 1 | -1/+1 | |
2023-10-17 | add 2023 watch pages | Sacha Chua | 1 | -0/+7 | |